Battery station as part of photovoltaic installation, Benkovski city
Location: Benkovski
Year and status: 2026, finished
As part of this project, we guided our clients through the entire process of installing three battery energy storage systems connected to a photovoltaic installation, as well as the reconstruction of the outdoor areas of the property housing the facility. Our role included providing consultation on technical and administrative requirements, assembling and coordinating the design team, preparing the architectural documentation, assisting with obtaining the building permit, and providing architectural supervision throughout construction.
Although relatively small in scale, the project was exceptionally valuable to us as an architectural practice. It gave us the opportunity to enter the dynamic energy sector, a field that presents both great interest and exciting challenges for our studio. We also had the chance to gain a deeper understanding of the sector's challenges and potential, while establishing valuable professional relationships with inspiring specialists, with whom it was a genuine pleasure to collaborate.